The Triway Local School District’s board of education, at its meeting on Monday night, was given an update on the district’s Pre-K thru 12th grade building project.  The architectural firm overseeing the project shared the schematic design plan for the three-story building, which calls for elementary students to be on the first floor, middle schoolers on the second and high schoolers on the third.  The firm hopes to complete the schematic design phase by early winter, at the very latest.